high quality mobile frac tank used for oilfield
A:TANk
1,Capacity and compartments:80000L in total,1 compartment
2,Tank shape:bottom is V-style ,side plate is wavy,roof is flat
3,Material of barrel : Q235Bcarbon steel,thickness is 5mm.
4,Shell cover: the two end is wavy,thickness is 6mm
5,baffle: wave style,thicknes is 4mm,500mm man hole in every peice,4 piece in total
B:PIPE AND COMPONENT
1,Manhole: open style manhole in the middle of roof
2,Pipe:one inlet on the rear,8''outlet on the front with 4 unit of 4'' fig quick coupling
3,liquidometer: assemble on the front
C:TANK ACCESSORIES
1,Top walkway: galvanised steel net overspead on the middle roof of tank
2,Side bumper:
3,Rear bumper:made of U-steel
4,Ladder: assemble on the right side of middle of tank,made of steel tube
D:CHASSIS
1,Pin: 50# brand: JOST
2,Girder: 16Mn
3,Axle: one axle,spring suspention,brand :FUWA 13T
4,Rim and tire: 4 sets of 12R22.5 (FENGSHEN BRAND)with for sets of ZHENGXING steel rims
5,Electric wire: 24V electric system,seven pinhole socket assemble on the front
6,ELectric landing gear:2 sets on the both side of the tankers.electric power from bttery on the tractor.
E:SURFACE AND INSIDE COATING
1,KIND OF COATING: Two primer,two finish paint
2,Color of tanker: depend on customer's requirement
3,The anti-rust inside paint: inside epoxy painting
Specification
the detail specification of 220 bbl frac tank
FLOOR: 1/4 PL, 4" V-bottom with integral formed side channels
FLOOR SUPPORT: 10" channel longitudinal runners with formed
1/4 PL crossmembers
WALLS: 1/4 PL solid welded, corrugated steel, corrugations 15"
on center
ROOF: Flat top, 1/4 PL solid welded with channel supports outside
FRONT/REAR: 1/4 PL solid welded, corrugated steel, 10" radius at vertical outside corners for the frac tank
DRAIN/FILL: 4" floor drain at rear end, 3" fill pipe to roof at rear, 4" suction line connection at front to sump, 8" flanged front manifold connection with turn down to floor. 8" exterior manifold with 4 - 4" couplings and plugs, hammer union sub, nut, and cap on ends
GEL LINE: 4" mid high connection on curb side, 4" internal pipe with 3/4" holes located on 12" centers towards floor center, capped on rear end (ends near side manway)
MANWAY: 21" manway on front and side, 3 - non-sealed hatches on roof of the 220 bbl frac tank
PICK UP: Standard 5th wheel king pin
WELDS: All welds continuous except substructure crossmembers
Company Introduction:
Luqiang Energy Equipment Co.,Ltd offers fuel storage tanks since 2004.It is a leading manufacturer located in Taian,Shandong.No matter what you need all kinds of mobile fuel stations ,storage tank, mud tanks, frac tank in carbon steel ,stainless or aluminum.
Certifications:
Our company has A1,A2 design license and manufacturing license of pressure vessel and issued by the State General Administration,and we have passed ISO 9001and America UL 142,1746 test and get the regarding certificate.Our frac tanks had exported Australia and gained great reputations.
Cooperation partner
We established good relationship with Shell company Petro China,Sinopec,CNOOC,World Food Programmer and petroleum companies in Asia ,middle East,Australia and Africa market. Frac tanks are popular all around the tanks.